Skip to main content

On Sale: GamesAssetsToolsTabletopComics
Indie game storeFree gamesFun gamesHorror games
Game developmentAssetsComics
SalesBundles
Jobs
TagsGame Engines

The pipes you have to be about 2-4 feet above the pipe, and you have to be directly above the label. The connection point is at the end of the pipe choke (that will appear when you attach to it) and it is always directly above the pipe label