How do i connect the chain to the pipes? I got it with the trench box but not the pipes
The pipes you have to be about 2-4 feet above the pipe, and you have to be directly above the label. The connection point is at the end of the pipe choke (that will appear when you attach to it) and it is always directly above the pipe label