Posted July 20, 2021 by ToastyCatStudios
This is a collection of low poly construction equipment that I will be modeling for the next 30 days. I plan to make the pipes more modular and I still need to add t-pipes, elbows, etc. Those should come out later today.
Added Electrical Utility Box-
Added Electrical Meter Box-
Thanks,
ToastyPlanetGames